--Revisions folders contain documents and files I did not use. All the files currently in use should be within the existing NED structure. --Vertical Accuracy run, not yet entered into report --SWath still needs to be looked at carefully: Point Cloud statistics run for swath, files need inspection -- problems already found during processing --Classified LAS looks ok, need to run a final PCS now that all tiles have arrived and are not corrupted. DEMs and breaklines accepted Waiting for Final Report and Metadata (these might be in the most recent delivery) I would receck all deliverables because everything came in so many small shippments, something may have been overlooked.