Las Statistics ran on I:\QC\Arizona\195122\VerticalAccuracy\checkpoints_shp\AZ_4FRI_3DEP_NVA_VVA_Checkpoints.shp 2021-08-06 13:44:36.273848 Run time was 0.0:5.0:16.086253 ===================================================================== The number of LPC NVA Checkpoints tested: 88 The NVA RMSEz= 4.55 cm The NVA Accuracy z at 95% confidence interval (RMSEz * 1.96) = 8.91 cm --------------------------------------------------------------------- The number of checkpoints tested for LPC VVA : 70 The 95th percentile value for LPC VVA is : 13.59 cm ===================================================================== Files used to compute statistics: \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0601n3778.laz - Fri Jul 30 13:56:43 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0645n3722.laz - Fri Jul 30 14:26:51 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0506n3819.laz - Fri Jul 30 12:40:29 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0506n3836.laz - Fri Jul 30 15:56:32 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0459n3803.laz - Fri Jul 30 12:46:05 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0470n3830.laz - Fri Jul 30 14:22:58 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0639n3757.laz - Fri Jul 30 15:32:46 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0605n3793.laz - Fri Jul 30 15:31:36 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0491n3831.laz - Fri Jul 30 14:50:51 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0523n3813.laz - Fri Jul 30 12:57:44 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0464n3814.laz - Fri Jul 30 15:29:12 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0515n3798.laz - Fri Jul 30 15:59:17 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0563n3800.laz - Fri Jul 30 13:38:13 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0476n3827.laz - Fri Jul 30 12:54:30 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0556n3813.laz - Fri Jul 30 15:19:15 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0544n3805.laz - Fri Jul 30 14:32:49 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0510n3829.laz - Fri Jul 30 13:24:01 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0452n3809.laz - Fri Jul 30 16:02:24 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0495n3844.laz - Fri Jul 30 16:06:54 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0467n3832.laz - Fri Jul 30 12:46:08 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0640n3771.laz - Fri Jul 30 14:19:55 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0571n3795.laz - Fri Jul 30 15:01:32 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0514n3802.laz - Fri Jul 30 16:43:12 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0525n3821.laz - Fri Jul 30 14:03:51 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0480n3829.laz - Fri Jul 30 16:19:44 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0510n3812.laz - Fri Jul 30 16:54:17 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0552n3821.laz - Fri Jul 30 15:23:50 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0532n3810.laz - Fri Jul 30 16:08:46 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0656n3724.laz - Fri Jul 30 16:24:53 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0483n3807.laz - Fri Jul 30 13:13:05 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0504n3798.laz - Fri Jul 30 16:26:21 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0514n3791.laz - Fri Jul 30 16:52:12 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0560n3802.laz - Fri Jul 30 14:19:21 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0514n3790.laz - Fri Jul 30 13:05:38 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0645n3754.laz - Fri Jul 30 16:30:13 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0662n3731.laz - Fri Jul 30 15:58:14 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0661n3731.laz - Fri Jul 30 15:53:06 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0509n3795.laz - Fri Jul 30 16:29:03 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0518n3779.laz - Fri Jul 30 12:33:20 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0513n3817.laz - Fri Jul 30 13:02:20 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0557n3803.laz - Fri Jul 30 13:10:25 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0515n3824.laz - Fri Jul 30 16:13:36 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0451n3819.laz - Fri Jul 30 16:24:38 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0677n3743.laz - Fri Jul 30 15:04:23 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0677n3727.laz - Fri Jul 30 12:30:38 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0599n3792.laz - Fri Jul 30 15:14:42 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0576n3791.laz - Fri Jul 30 13:25:53 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0523n3823.laz - Fri Jul 30 12:59:29 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0519n3815.laz - Fri Jul 30 14:47:08 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0486n3820.laz - Fri Jul 30 13:48:17 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0462n3813.laz - Fri Jul 30 15:01:50 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0462n3812.laz - Fri Jul 30 14:04:03 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0546n3813.laz - Fri Jul 30 16:09:53 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0457n3817.laz - Fri Jul 30 14:14:58 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0581n3795.laz - Fri Jul 30 15:57:27 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0519n3800.laz - Fri Jul 30 16:22:23 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0651n3764.laz - Fri Jul 30 14:25:32 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0483n3799.laz - Fri Jul 30 16:33:22 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0619n3787.laz - Fri Jul 30 14:06:30 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0515n3789.laz - Fri Jul 30 14:33:44 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0589n3786.laz - Fri Jul 30 14:38:21 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0634n3769.laz - Fri Jul 30 14:24:33 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0480n3819.laz - Fri Jul 30 16:54:09 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0469n3821.laz - Fri Jul 30 16:13:16 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0520n3808.laz - Fri Jul 30 15:32:36 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0502n3810.laz - Fri Jul 30 15:13:18 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0565n3798.laz - Fri Jul 30 12:47:34 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0483n3832.laz - Fri Jul 30 15:49:01 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0482n3832.laz - Fri Jul 30 13:44:57 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0519n3829.laz - Fri Jul 30 14:44:20 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0507n3823.laz - Fri Jul 30 12:52:19 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0455n3819.laz - Fri Jul 30 14:51:27 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0489n3836.laz - Fri Jul 30 15:00:41 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0490n3836.laz - Fri Jul 30 16:51:59 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0502n3804.laz - Fri Jul 30 16:29:00 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0672n3755.laz - Fri Jul 30 16:17:35 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0651n3716.laz - Fri Jul 30 16:09:45 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0486n3801.laz - Fri Jul 30 16:46:31 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0485n3801.laz - Fri Jul 30 15:43:49 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0667n3738.laz - Fri Jul 30 15:37:52 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0529n3816.laz - Fri Jul 30 14:19:38 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0528n3798.laz - Fri Jul 30 12:44:17 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0589n3796.laz - Fri Jul 30 16:08:10 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0581n3799.laz - Fri Jul 30 15:50:02 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0652n3715.laz - Fri Jul 30 14:12:21 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0470n3822.laz - Fri Jul 30 14:50:01 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0566n3799.laz - Fri Jul 30 15:59:57 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0538n3809.laz - Fri Jul 30 16:44:34 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0586n3789.laz - Fri Jul 30 14:14:11 2021 \\igskrdcnfscldsr\elevation\PRD\Output\restricted\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0635n3763.laz - Fri Jul 30 13:22:42 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0543n3807.laz - Fri Jul 30 16:44:16 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0595n3779.laz - Fri Jul 30 15:12:19 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0545n3800.laz - Fri Jul 30 16:34:54 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0665n3748.laz - Fri Jul 30 16:50:19 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0651n3769.laz - Fri Jul 30 13:43:45 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0595n3793.laz - Fri Jul 30 15:37:00 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0553n3806.laz - Fri Jul 30 16:57:56 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0479n3816.laz - Fri Jul 30 16:36:01 2021 \\igskrdcnfscldsr\elevation\PRD\Output\restricted\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0553n3796.laz - Fri Jul 30 13:12:37 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0570n3792.laz - Fri Jul 30 14:28:08 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0659n3755.laz - Fri Jul 30 13:40:03 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0672n3741.laz - Fri Jul 30 16:34:13 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0577n3795.laz - Fri Jul 30 16:13:11 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0602n3780.laz - Fri Jul 30 16:24:08 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0484n3800.laz - Fri Jul 30 15:25:22 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0538n3803.laz - Fri Jul 30 15:59:53 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0494n3797.laz - Fri Jul 30 13:40:52 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0594n3781.laz - Fri Jul 30 16:53:41 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0459n3812.laz - Fri Jul 30 16:33:25 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0641n3733.laz - Fri Jul 30 15:37:54 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0512n3779.laz - Fri Jul 30 13:27:35 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0671n3755.laz - Fri Jul 30 15:39:13 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0530n3810.laz - Fri Jul 30 14:24:46 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0629n3775.laz - Fri Jul 30 16:55:57 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0603n3786.laz - Fri Jul 30 16:31:47 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0652n3742.laz - Fri Jul 30 13:57:14 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0518n3778.laz - Fri Jul 30 12:42:29 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0508n3792.laz - Fri Jul 30 16:11:31 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0512n3822.laz - Fri Jul 30 14:58:49 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0578n3805.laz - Fri Jul 30 14:02:55 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0633n3785.laz - Fri Jul 30 14:57:23 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0585n3802.laz - Fri Jul 30 15:24:53 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0454n3810.laz - Fri Jul 30 15:47:35 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0565n3808.laz - Fri Jul 30 12:37:12 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0526n3821.laz - Fri Jul 30 15:48:36 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0492n3842.laz - Fri Jul 30 15:47:51 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0510n3830.laz - Fri Jul 30 15:20:00 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0569n3794.laz - Fri Jul 30 14:16:34 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0550n3798.laz - Fri Jul 30 16:34:37 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0527n3819.laz - Fri Jul 30 15:47:52 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0675n3752.laz - Fri Jul 30 16:25:23 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0589n3792.laz - Fri Jul 30 15:18:24 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0550n3818.laz - Fri Jul 30 16:54:50 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0493n3842.laz - Fri Jul 30 13:48:14 2021 \\igskrdcnfscldsr\elevation\PRD\Output\distribution\LPC\Projects\AZ_USFS_3DEP_Processing_2019_D20\AZ_USFS_3DEP_Processing_2019\LAZ\USGS_LPC_AZ_USFS_3DEP_Processing_2019_D20_w0649n3759.laz - Fri Jul 30 13:23:44 2021